Wednesday, 4 January 2017

Supervising the Construction of the Set

The other day we went to check how the process of building our set was going. Paul was very attentive and told us all the details of the construction. We asked for some information about the bed and mattress, and decided to put lights behind the windows to add some atmosphere to the scene. I reminded him about the position of the pieces of furniture around the room as well, so that everything would be perfectly sorted by Monday.

Ellis has made some props to use them as additional material decorating the room: key chains with pictures of Moscow and a book about Trans-Siberian routes. Emma is going to bring a chair and some sheets for the bed. Myles will contribute with two passports and his flight and train tickets.


No comments:

Post a Comment